Transportation and Infrastructure
Site Infrastructure
Site infrastructure is operational and will support development
for the first 5-7 years of the redevelopment. Current
infrastructure includes:
- Electricity
- Water
- Wastewater
- Telecommunications
Onsite Roads
Bruja Boulevard (also called Andrews Boulevard) is the main
thoroughfare from north to south on the site. Bruja is four
lanes through the airport and administration office areas, with two
lanes travelling each direction.
Future planned improvements
- A new road on the west side of the
project will be built in the next two years to provide access to
the future logistics and high tech parks.
- A number of internal roadways will be
built for easy access to all internal areas.
- Bruja / Andrews Boulevard will be
upgraded.
- New junctions will be constructed on East
Veracruz Road.
Transportation
Public bus stops current exist:
- At the north and south site entrances,
and
- Onsite along Bruja Boulevard
A comprehensive internal bus system is planned in the future to
allow easy pedestrian access throughout the community.